Transmission is how a surplus in one region reaches a deficit in another within the same interval. This page explains the layering that makes that possible, the algorithm underneath it, and the two approximations in its cost model. For the full invariant detail, see the domain model.
Interconnectors are directed and owned by the system
An Interconnector holds one directed transfer capacity, from FromRegionId to ToRegionId,
metered at the sending end. It is owned by PowerSystem, not by either endpoint region, because a
link belongs to neither region alone and attributing it to one side or the other would be
arbitrary. A corridor that carries flow both ways is not one bidirectional link; it is two
directed interconnectors, each independently declared and each independently costed. That
convention matters for economics too: see Economics and
Limitations §6
for what declaring both directions does to reported cost.
The layering
InterRegionalTransfer is the only place the domain meets the graph, and the split of
responsibility is the interesting part:
- The transfer layer (
InterRegionalTransfer) knows about regions, power, and losses. It maps each region's post-generation surplus or deficit onto a node in a capacity graph, delegates to the pure algorithms below to find out what can move, and books the outcome back onto the regions as imports and exports. - The algorithm layer (
NEM.Model/Algorithms) knows none of that.EdmondsKarpfinds maximum flow on an abstract capacity graph;FlowPathDecompositionturns an edge-flow solution into discrete source-to-sink routes;PrioritisedTransferSolversequences sinks and calls both. None of it has ever heard of a region, a megawatt, or a transmission loss. Those are the transfer layer's concern entirely.
That separation is what keeps the max-flow solver a genuinely standard one: it never has to reason about losses, priority, or anything domain-specific, and the transfer layer never has to reimplement graph search.
Prioritised transfer
Regions in deficit are ranked by size, largest first (ties broken by region identity for determinism), and served one at a time. Each sink gets a full max-flow solve over whatever source capacity remains after every higher-priority sink has already been served. Once a sink's committed flow is settled, it is subtracted from edge capacity, and the next sink starts from a fresh network built on what is left, not from the residual graph a max-flow solve would normally leave behind. That matters: a max-flow solve's residual graph carries reverse edges that a later solve could push flow back along, effectively clawing back capacity already committed to an earlier sink. Discarding the residual graph at each stage boundary is exactly what stops that. No reverse edge crosses a stage boundary, so a lower-priority region can never claw back flow already committed to a higher-priority one.
That guarantee, that a higher-priority region is never starved by a lower-priority one, is also exactly why the result is not a global optimum. A different allocation might serve total demand better in aggregate while starving the top-priority sink a little; the solver will never choose that allocation.
Why a sink is solved iteratively
A sink's requirement is stated at the receiving end, as how much it still needs delivered, but max-flow capacity is metered at the sending end of every edge, and a route's hop count (and therefore how much of what is sent actually survives to arrive) is not known until the flow is decomposed into paths after the solve. Those two units do not reconcile in one shot, so each sink is solved by successive approximation: send as much as the outstanding requirement suggests, measure what actually arrived after losses, and solve again for whatever shortfall remains. Because delivered energy can never exceed sent energy, each round can only reduce the outstanding requirement rather than overshoot it, so the sequence converges geometrically toward exactly satisfying the sink, or toward the network's true capacity limit if it cannot be fully satisfied.
Losses
Every hop of a transfer loses a flat 5% of what enters that hop, applied over the max-flow
result rather than folded into the search itself. Because capacity in the graph is metered at the
sending end of every edge, flow is exactly conserved in the capacity graph, and the max-flow search
never has to reason about decay along a route. That is precisely what keeps it a standard max-flow
problem. A two-hop route delivers 0.95² of what it sent; a hop count of n delivers 0.95ⁿ.
This 5% figure is an unsourced placeholder. AEMO publishes marginal loss factors per interconnector, and they are neither flat nor equal across links. Any conclusion that depends materially on inter-regional transfer inherits this uncertainty until a cited value replaces it. See Model assumptions for the tracking reference (NEM-053), which is the highest-priority open assumption in the model.
What can be exported
An export draws first on generation that would otherwise be curtailed, because moving that energy to an export costs nothing extra and starts no new plant. Only then does it draw on dispatchable headroom, started specifically to serve the export, in ascending merit order. Pumped hydro is excluded from what can be exported entirely, because storage is decided after transfer runs for the interval; by the time storage would have something to offer, the export decision has already been made.
Conventional Hydro is not excluded, but its exportable headroom is capped to exactly the same
per-interval pace HydroReservationState already computed for local dispatch (see
Dispatch). Serving an export from Hydro can substitute for local demand this interval,
but it can never dip into budget that pacing set aside for a future local peak. The export sees
precisely the same allowance local dispatch saw, not a separate or larger one. Hydro's 10% reserve
share is never exportable at all: it is reachable only from the local, post-storage fallback that runs
strictly after transfer has already finished for the interval.
Loss accounting
SystemDispatchOutcome.TransmissionLosses is calculated as exports − imports, and every interval
that figure is cross-checked against the loss the transfer solver reports directly from its own flow
decomposition. Those are two independent derivations of the same quantity, reconciled rather than
assumed consistent.
A separate regional transmission-loss series exists on published artifacts, built by assigning each directed link's loss to its receiving region. That is an accounting attribution for readability, not a measurement of where the loss physically occurred along the link, and it is not a transmission charge against that region. Economics explains why transmission is costed once, at system level, and never split across regions. Only a system-level artifact publishes the underlying directional forward/reverse link series that attribution is built from.
Costing
Interconnector cost is charged against the great-circle distance between its two endpoint regions'
solar weather sites, which are the only source of a region's location in the model, and its
directed transfer capacity, using the DistancePowerCost and AnnualDistancePowerCost rates
described in Economics. Two approximations compound in that route length, and both
inflate reported transmission cost: the solar site is chosen for resource quality, not for where a
real transmission line terminates, so modelled distance runs long against the actual NEM corridors;
and because each corridor is declared as two directed interconnectors, the same kilometre of
conductor is paid for twice, once per direction.
Limitations §6
carries the full model-versus-actual distance table and the roughly 1.8× cost consequence of
double-costing reciprocal links, so this page does not repeat them.
Next
- Dispatch: where transfer sits between generation and storage within an interval.
- Economics: how the capacity and route length described here become an annual cost.
- Limitations §6 and Limitations §7: the two places transmission figures will mislead you.