Storage sizing

Storage sizing is the framework step that, given a realised system that misses its reliability target, searches for the Battery capacity that meets it, or reports why the bounded search could not. It is StorageSizingService in NEMSweep.Model and, like dispatch, is region-agnostic.

This page explains that search. For the full invariant detail, see Storage sizing and Storage in the domain model.

The loop

StorageSizingService.Size is pure and whole-system scoped. It never mutates the system it is handed. Instead it builds an immutable PowerSystem candidate, re-dispatches the entire linked system, meaning every region and not just the one being grown, and checks every region's dispatch outcome against the configured reliability target. Only regions that fail are grown; a compliant region is left untouched. The loop is:

build a candidate PowerSystem
dispatch the whole linked system
check every region against the USE target
grow one failing region, then re-dispatch and re-rank
repeat

Re-dispatching the whole system on every candidate, rather than just the region being resized, is what keeps the search honest about inter-regional transfer: growing one region's Battery can change what it needs to import or can afford to export, which can move another region's outcome too.

Only Battery is sizeable. Pumped hydro is fixed at whatever the scenario declared, because a new pumped-hydro scheme is a specific site and reservoir, not a quantity that scales in arbitrary increments the way a battery fleet does.

The floor

A region with no Battery, or one below the floor, is raised to it before growth begins: 30 MW and 120 MWh, which together fix a four-hour minimum duration. Every candidate the search produces after that, at every stage of growth and refinement, preserves that four-hour floor. The floor exists because probing upward from a fleet too small to change the outcome at all would waste dispatch passes on candidates that could never matter.

Growth

Once a region is at or above the floor, each growth iteration doubles its current Battery capacity. It probes larger energy, larger power (bounded by the four-hour duration floor at the new power level), and a combined larger-energy-and-power candidate, each capped at the configured maximum power and maximum energy for that region. Every candidate is dispatched against the whole linked system. Within that region, the search accepts its best candidate only when that candidate reduces the region's own total unserved energy by more than 0.001 MWh. Peak unserved power does not override this acceptance threshold.

When more than one region fails, growth priority is the region with the greatest total unserved energy, with equal totals ordered by ordinal region ID. The search grows only that region, then re-dispatches and re-ranks all regions after an accepted change. If a region has no larger candidate, or its best candidate does not clear the material-improvement threshold, it is blocked for the current system state; the search skips it and tries the other failing regions. After any accepted change, all still-failing regions are reconsidered and ranked again. Thus one blocked region does not prevent another from improving or reaching its target.

Growth stops when every currently failing region is blocked, the dispatch-pass budget is exhausted, or the whole-system energy assessment applies. Per-region results identify the blocker that applies to that region. If growth makes no progress while regions still fail, the whole-system status is BatteryCapacityLimitReached when any failing region has no larger candidate; otherwise it is StorageNoLongerImprovesReliability. A cap on only power or only energy is not exhaustion when a larger candidate remains on another dimension. Termination evidence lists all currently failing regions and their blockers. These outcomes describe the bounded search, not global infeasibility or optimality; only EnergyLimited proves that additional Battery storage cannot meet the target under the assessed total-energy deficit.

The descending-unserved-energy priority is intentional and can change successful sizing results compared with growing regions in ordinal order. It does not change dispatch behavior or reserve stored energy for a forecast event.

Refinement

Once every region is compliant, the search is not finished: doubling can overshoot by a wide margin, so each region the search actually changed is refined by bisection in ordinal region order. It refines power first, then energy, to 1 MW and 1 MWh precision, using a full-system dispatch at each probe and keeping only candidates that remain compliant across the whole system. A region the growth phase never touched is left exactly as installed; refinement only revisits changed regions.

The six outcomes

A run terminates in one of six StorageSizingOutcome values. The JSON name is what a published artifact carries; the .NET name is what you see in the API reference and in source. Whole-system results and sweep points report the search's aggregate outcome. Regional results and regional summaries report that region's outcome, which can differ from the aggregate.

JSON name .NET name Whole-system meaning Regional meaning What to do next
notRequired NotRequired Every region met the target with unchanged installed Battery capacity. This region meets its target and its Battery capacity was unchanged, even if another region failed. No additional Battery was required for the reported scope.
resized Resized Every region meets its target after growth and completed refinement. This region meets its target and its Battery capacity changed. Other regions may still fail, so refinement may never have run. A successfully refined whole-system result is near-frontier, not cost-optimal. Do not interpret a compliant region's capacity in a failed run as a refined requirement.
energyLimited EnergyLimited Total available generation energy across the whole system is under total demand energy. This region still fails when the system-wide energy assessment terminates the search; the evidence is not a region-specific energy deficit. Add generation, not storage. See when storage cannot be the answer.
storageNoLongerImprovesReliability StorageNoLongerImprovesReliability Growth made no progress: every still-failing region had larger candidates, but none materially reduced its own unserved energy. This region's tested larger candidates did not reduce its own unserved energy by more than 0.001 MWh. Other regions may be compliant or capacity-blocked. Investigate timing or storage-policy limitations (see Limitations §4); stagnation is not infeasibility.
batteryCapacityLimitReached BatteryCapacityLimitReached Growth made no progress and at least one still-failing region had no larger allowed candidate. Other failing regions may have stagnated. This region still fails and has no larger candidate under its configured Battery power and energy limits. Raise a limiting ceiling or accept the residual shortfall. A single dimension at its ceiling is not exhaustion if another larger candidate remains.
passLimitReached PassLimitReached The dispatch-pass budget was exhausted during growth or refinement. If refinement was interrupted, every region can already meet its target. This region still fails when the whole-run pass budget expires; it has not necessarily exhausted its own candidates. A compliant region instead reports notRequired or resized. Raise maximumPasses; interrupted growth is inconclusive on feasibility, and interrupted refinement is not a completed near-frontier result.

Only energyLimited is a proof that no Battery could have met the target. Capacity-limit, stagnation, and pass-limit outcomes are evidence about this bounded search, not proof of global infeasibility or optimality.

When storage cannot be the answer

Whenever a dispatch fails its target, the model separately checks whether the failure could ever be fixed by storage at all. EnergyLimitedAssessment sums generator availability and demand across every aligned region in the whole PowerSystem, applying the same renewable-resource and monthly generation-budget rules dispatch itself uses. Storage is excluded from that sum, deliberately: a battery shifts energy between intervals but cannot add to the whole-period total, so including it would let a system smuggle in a false pass. If total available generation energy across the system is below total demand energy over the dispatch period, the run reports EnergyLimited with the available energy, demand energy, the shortfall, and the intervals where available power fell short of demand power.

This assessment is a system-level proof, and it is deliberately not attributed to any one region: it says something about the system's aggregate energy balance, not about which region's fleet is short. Two things follow from what it actually proves. A total-energy shortfall proves infeasibility outright, even under an idealised assumption of unrestricted future transfer between regions. The converse does not hold, though: adequate total system energy does not prove the network can actually deliver it. A region can still fail its target for reasons that have nothing to do with total energy, such as transfer capacity, timing, or local Hydro pacing.

Seeding

The opening state of charge for every storage fleet is 80% of installed capacity for PumpedHydro and 50% for everything else. It is computed once, from the scenario-declared installed capacity, and never from capacity storage sizing has since grown. If growing a fleet also grew its opening balance, the search would be handing itself free energy at the start of every candidate it tested, and would stop measuring what installed capacity alone achieves, which is the thing actually being searched over. See Model assumptions for the seed fractions themselves.

What a sizing result is, and is not

A sizing result is a deterministic coordinate-wise near-frontier point. It is not a global minimum, and it is not cost-optimal: nothing in the search prices the capacity it adds, so the search cannot trade off, say, more Battery energy against less Battery power, or against a different technology entirely. A different search order, meaning a different growth or refinement strategy, could land on a different but equally compliant point. Two sizing results from the same procedure are comparable to each other because the procedure is deterministic; neither one is "the answer" in any stronger sense. See Limitations §5 for what that means for how you should read a sizing result.

Next

  • Dispatch: the mechanism each sizing candidate is re-run against.
  • Economics: how the final Battery capacity a sizing run settles on gets costed.
  • Limitations: where sizing results will mislead you if read as more than they are.